Manufacturing Orders

Once the bills of materials have been defined, OpenERP is capable of automatically deciding on the manufacturing route according to the needs of the company.

Production orders can be proposed automatically by the system depending on several criteria described in the preceding chapter:

  • Using the Make to Order rules,
  • Using the Order Point (Minimum Stock) rules,
  • Using the Production plan.

Of course, you can also start production manually by clicking the button New in the menu Manufacturing ‣ Manufacturing ‣ Manufacturing Orders.

../../_images/mrp_manual.png

Manufacturing Order

If you have not installed the Just-in-Time planning module mrp_jit, you should start using OpenERP to schedule the Production Orders automatically using the various system rules. To do this, use the menu Warehouse ‣ Schedulers ‣ Compute Schedulers.

Tip

Procurement Exceptions

Pay attention to the fact that you have to define minimum stock rules for each product set as Make to Stock.

Complete Production Workflow

To understand the usefulness and the functioning of the system you should test a complete workflow on the database installed with the demonstration data. We will show you:

  • How to create a sales order,
  • The manufacturing workflow for an intermediate product,
  • The manufacturing of an ordered product,
  • The delivery of products to a customer,
  • Invoicing at the end of the month,
  • Traceability for after-sales service.

Tip

Demonstration data

To exactly follow the workflow as shown below, you should keep the same quantities as in the example and start from a new database. Then you will not run into exceptions resulting from a lack of stock.

This more advanced case of handling problems in procurement will be sorted out later in the chapter.

To be able to do the following step, add Sales Management through the Reconfigure wizard.

The Sales Order

Begin by encoding a sales (or customer) order through the menu Sales ‣ Sales Orders -> New Quotation. Enter the following information:

  • Customer : Agrolait,
  • Shipping Policy : Invoice from the picking (Other Information tab),
  • Sales Order Lines, click New:
    • Product : PC2 – Basic PC (assembly on order),
    • Quantity (UoM) : 1,
    • Product UoM : PCE,
    • Procurement Method : on order.

Once the quotation has been entered, you can confirm it immediately by clicking the button Confirm Order at the bottom to the right. Keep note of the order reference because this follows all through the process. Usually, in a new database, this will be SO007 . At this stage, you can look at the process linked to your order using the Question Mark button next to the Sales Orders title.

../../_images/mrp_sales_process_new.png

Process for Handling Sales Order SO007

Start the requirements calculation using the menu Manufacturing ‣ Compute All Schedulers.

Producing an Intermediate Product

To understand the implications of requirements calculation, you should know the configuration of the sold product. To do this, go to the form for product PC2 and click the link Product BoM Structure to the right. You get the scheme shown in Composition of PC2 which is the composition of the selected product.

../../_images/mrp_product_bom_tree_new.png

Composition of PC2

The PC2 computer has to be manufactured in two steps:

1: The intermediate product: CPU_GEN

2: The finished product using that intermediate product: PC2

The manufacturing supervisor can then consult the production orders using the menu Manufacturing ‣ Manufacturing ‣ Manufacturing Orders. You then get a list of orders to start (Ready to Produce) and the estimated start date (Scheduled Date) to meet the customer delivery date.

../../_images/mrp_production_list_new.png

List of Manufacturing Orders

You will see the production order for CPU_GEN, but not the one for PC2 because it depends on an intermediate product that has to be produced first. Return to the production order for CPU_GEN and click it. If there are several of them, select the one corresponding to your order using the source document that contains your order number (in this example SO007 ).

../../_images/mrp_production_form_new.png

Details of a Production Order

The system shows you that you have to manufacture product CPU_GEN using the components: MB1, CPU1, FAN, RAM. You can then confirm the production twice:

Start production: consumption of raw materials,

Produce: manufacturing of finished product.

Click the Start Production button, then click the Edit button, and edit the line for the product MB1. Enter a lot number for it by putting the cursor in the field Production Lot and pressing <F1> to create a new lot. Enter an internal reference, for example: MB1345678. The system may then show you a warning because this lot is not in stock, but you can ignore this message.

Click the Produce button to manufacture the finished product.

The production order has to be in the closed state as shown in the figure Production Order after the Different Stages.

../../_images/mrp_production_form_end_new.png

Production Order after the Different Stages

Finished Product Manufacturing

Having manufactured the intermediate product CPU_GEN, OpenERP automatically proposes the manufacturing of the computer PC2 using the order created earlier. Return to the Manufacturing Orders menu and look at the orders Ready to Produce through Manufacturing ‣ Manufacturing ‣ Manufacturing Orders.

You will find computer PC2 which has been sold to the customer (source document SO007), as shown in the figure hereafter.

../../_images/mrp_production_list_end_new.png

Completed Production for PC2

Now that the production has been completed, the product sold to the customer has been manufactured and the raw materials have been consumed and taken out of stock.

Tip

Automatic Actions

As well as managing the use of materials and the production of stocks, manufacturing can have the following automatic effects which are detailed further on in the chapter:

  • adding value to stock,
  • generating operations for assembly staff,
  • automatically creating analytical accounting entries.

Subproduct Production

If you need to manage subproducts, you should install the module mrp_subproduct (Reconfigure wizard, MRP Sub- products). The normal behaviour of manufacturing in OpenERP enables you to manufacture several units of the same finished product from raw materials (A + B > C). With Subproduct management, the manufacturing result can be to have both finished products and secondary products (A + B > C + D).

Note

Subproduct Material

In OpenERP, subproduct material corresponds to secondary products that are a by-product of the main manufacturing process. For example, cutting planks of timber will produce other planks but these bits of timber are too small (or the offcuts may have value for the company if they can be used elsewhere).

If the module mrp_subproduct has been installed, you get a new tab Sub products in the Bill of Material that lets you set secondary products resulting from the manufacturing of the finished product.

../../_images/mrp_bom_subproduct.png

Definition of Subproducts

When OpenERP generates a production order based on a bill of materials that uses a secondary product, you pick up the list of all products in the second tab of the production order Finished Products.

../../_images/mrp_production.png

Production Order producing Several Finished Products

Secondary products enable you to generate several types of products from the same raw materials and manufacturing methods - only these are not used in the calculation of requirements. Then, if you need the secondary products, OpenERP will not ask you to manufacture another product to use the waste products and secondary products of this production. In this case, you should enter another production order for the secondary product.

Note

Services in Manufacturing

Unlike most software for production management, OpenERP manages services as well as stockable products. So it is possible to put products of type Service in a bill of materials. These do not appear in the production order, but their requirements will be taken into account.

If they are defined as Make to Order, OpenERP will generate a task for the manufacturing or a subcontract order for the operations. The behaviour will depend on the Supply Method configured in the product form: Buy or Produce.

Scrapping

If you have to scrap the final product before it is finished, you will have to scrap every component allowed for this product.

../../_images/mo_scrap.png

Scrapping a Product to Finish

If you scrap a Product to Finish, you will get the situation illustrated in the previous figure. A finished product will be created and put in the scrapped virtual location. A new Product to Finish has been added to the manufacturing order.

Tip

Scrap a product

To scrap a product, you have to edit the manufacturing order and then select the product to be scrapped by clicking the little pencil at the left of the item.

This new product has been added for the following reason: when you have to manufacture a product and if this product has to be scrapped, you have to produce another product to replace the scrapped one. The reason why you have to scrap each component manually is that the production problem can come from one component.

If the production process is finished and you see that you have to scrap the finished product, you will not have to scrap the different components. They are already consumed. They are not available anymore for further manufacturing orders; they have been moved to the production Stock Location.

Production Orders

To open a Production Order, use the menu Manufacturing ‣ Manufacturing ‣ Manufacturing Orders and click the New button. You get a blank form to enter a new production order as shown in the figure New Production Order.

../../_images/mrp_production_new.png

New Production Order

The production order follows the process given by the figure Process for Handling a Production Order.

../../_images/mrp_production_processus.png

Process for Handling a Production Order

The Scheduled date , Product Qty and Reference, are automatically completed when the form is first opened. Enter the product that you want to produce, and the quantity required. The Product UOM by default is completed automatically by OpenERP when the product is first selected.

You then have to set two locations:

  • The location from which the required raw materials should be found, and
  • The location for depositing the finished products.

For simplicity, put the Stock location in both places. The field Bill of Materials will automatically be completed by OpenERP when you select the product. You can then overwrite it with another BoM to specify something else to use for this specific manufacturing, then click the button Compute Data.

The tabs Scheduled Products and Work Orders are also completed automatically when you click Compute Data (in the Work Orders or Scheduled Products tabs). You will find the raw materials there that are required for the production and the operations needed by the assembly staff.

If you want to start production, click the button Confirm Production, and OpenERP automatically completes the Products to Consume field in the Consumed Products tab and Products to Finish field in Finished Products tab.

The information in the Consumed Products tab can be changed if:

  • you want to enter a serial number for raw materials,
  • you want to change the quantities consumed (lost during production).

For traceability, you can set lot numbers on the raw materials used, or on the finished products. Note the Production Lot and Pack numbers.

Once the order is confirmed, you should force the reservation of materials using the Force Reservation button. This means that you do not have to wait for the scheduler to assign and reserve the raw materials from your stock for this production run. This shortens the procurement process.

If you do not want to change the priorities, just leave the production order in this state and the scheduler will create a plan based on the priority and your planned date.

To start the production of products, click Start Production. The raw materials are then consumed automatically from stock, which means that the draft ( Waiting ) movements become Done.

Once the production is complete, click Produce. The finished products are now moved into stock.

Project Versions

Table Of Contents

Previous topic

Bill of Materials and Components

Next topic

Logistics and Manufacturing

This Page